Construction
-
Construction of Masjid in Um SenemAnd Al Wakra
- June 4, 2017
- Posted by: grp_admin
- Category:
No CommentsClient: Promer Qatar WLL
-
Al Wasil Compound 64 Villas
- June 4, 2017
- Posted by: grp_admin
- Category:
Client: Premium Construction WLL
-
Excavation & Disposal for Umm Al Houl Power IWPP
- June 4, 2017
- Posted by: grp_admin
- Category:
Client: Qatar Petroleum Scope of Work: The scope includes excavation and material disposal Performed as: Sub Contractor Main Contractor: Simplex Infrastructure Limited Contract Value: 2.3M Contract Award: 2015
-
Interlock System & Curbstone
- June 4, 2017
- Posted by: grp_admin
- Category:
Client: ETA Engineering
-
Trench Work for Umm Al Afai
- June 4, 2017
- Posted by: grp_admin
- Category:
Client: ETA Engineering
-
(2B+G+41) Arwa Tower, Block Work
- June 4, 2017
- Posted by: grp_admin
- Category:
Derwind Trading & Contracting Co. W.L.L.
-
Majlis of Sheikh Ali Abdullah Thani Jassim Al Thani
- June 4, 2017
- Posted by: grp_admin
- Category:
Um Haish Trading & Contracting Co. W.L.L.
-
Renovation of Existing Park at Zone 66
- June 4, 2017
- Posted by: grp_admin
- Category:
Client: Ashghal Scope of Work: The work includes Concrete Paving work, jogging Track, column Foundation, Water fountain Electrical and Mechanical work Performed as: Sub Contractor Main Contractor: Palmera Landscaping Contract Value: 1M Contract Award: 2016
-
El Jaish Football Stadium, Concrete Work
- June 4, 2017
- Posted by: grp_admin
- Category:
Client: Palmera Agricultural Business LLC
-
Excavation, Disposal of Excavated Materials and Back Filling at ORYX GTL
- June 4, 2017
- Posted by: grp_admin
- Category:
Trading & Agency Serviced Ltd. W.L.L.
- 1
- 2